shibboleth-dev - RE: RPM problems
Subject: Shibboleth Developers
List archive
- From: Digant C Kasundra <>
- To:
- Subject: RE: RPM problems
- Date: Fri, 10 Nov 2006 10:43:07 -0800
--On Thursday, November 09, 2006 10:14 PM -0500 Scott Cantor <> wrote:
I'm trying to keep up with the RPMs (we resign and keep them on our
local Satellite server) but I'm having problems because release numbers
aren't being properly incremented.
Nothing (codewise) has changed, so I didn't increment anything. All I did
was setup a new staging area and sign the files.
Looking in the current source RPMs directory
on the site, I see the xerces-c release 2 package with a timestamp of
Nov 8th, making it the 3rd release 2 xerces-c package I've seen.
If the RPM release number isn't incremented, it hasn't changed. That much
I will promise. I can't promise the timestamp will be the same forever. If
that's a requirement for you, I'm sorry, but I'm not willing to guarantee
that.
-- Scott
The timestamp thing is fine. We had some local tools compiled against xerces-c. I had two rpms with the same version and release number. The tool complained about one of the symbols being a different size in the shared object with the newer RPM with a build date of Oct 6, but executed fine with the older RPM against which I had originally compiled the tool (build date Jun 05). This means the two packages are not equivalent and should have had a different release number in my opinion.
--
Digant C Kasundra
<>
Technical Lead, ITS Unix Systems and Applications, Stanford University
- RPM problems, Digant C Kasundra, 11/09/2006
- RE: RPM problems, Scott Cantor, 11/09/2006
- RE: RPM problems, Digant C Kasundra, 11/10/2006
- RE: RPM problems, Scott Cantor, 11/10/2006
- RE: RPM problems, Digant C Kasundra, 11/10/2006
- RE: RPM problems, Scott Cantor, 11/10/2006
- RE: RPM problems, Digant C Kasundra, 11/10/2006
- RE: RPM problems, Scott Cantor, 11/09/2006
Archive powered by MHonArc 2.6.16.