Hi Andrew,

The other tests I schedule with an wrong argument and this was the reason why it was not working.

Thanks,

--


Murilo Vetter
Analista REMEP-FLN/PoP-SC
PoP-SC - Ponto de Presença da RNP em Santa Catarina
REMEP-FLN - Rede Metropolitana de Educação e Pesquisa da Região de Florianópolis
RNP - Rede Nacional de Ensino e Pesquisa
UFSC - Universidade Federal de Santa Catarina
SETIC - Superintendência de Governança Eletrônica e Tecnologia da Informação e Comunicação
Fundações de Apoio FEESC e FEPESE
--/--

www.pop-sc.rnp.br
remep.pop-sc.rnp.br
CHAMADOS:

+55(48)3721-3000
INOC: 11242*100



De: "Andrew Lake" <>
Para: "Murilo Vetter" <>
Cc:
Enviadas: Quinta-feira, 16 de julho de 2015 17:30:41
Assunto: Re: [perfsonar-user] Running ping tests on parallel using bwctl

Hi Murilo,

I believe that by default  BWCTL does in fact run ping tests in parallel since in theory the ping tests should not interfere with each other (unlike bandwidth tests). In theory what you describe should “just work”.

Andy




On Thu, Jul 16, 2015 at 4:24 PM, Murilo Vetter <> wrote:

Hi guys,

Here in RNP we are updating our portal to use a newer version of BWCTL and trying to use it to control our schedules.
We are starting the development here, and we are wondering if there is a way to run bwctl client on parallel.
For instance, we want to schedule 100 different ping tests and call it by bwctl.
In the first moment, we schedule 2 tests every minute and even in this cennario, one test run ou of time and doesn't show the results. Just one test it show correctly the result.

My expectation were to run tests in parallel in some way that it doesn't run out of time.
How could I configure BWCTL to run parallel test without conflict?

We are using bwctl-1.5.4.

In our older version of MonIPE, we run ping test straight and it works pretty well.

Thanks,

--

<assinatura_pop.jpg>


Murilo Vetter
Analista REMEP-FLN/PoP-SC
PoP-SC - Ponto de Presença da RNP em Santa Catarina
REMEP-FLN - Rede Metropolitana de Educação e Pesquisa da Região de Florianópolis
RNP - Rede Nacional de Ensino e Pesquisa
UFSC - Universidade Federal de Santa Catarina
SETIC - Superintendência de Governança Eletrônica e Tecnologia da Informação e Comunicação
Fundações de Apoio FEESC e FEPESE
--/--

www.pop-sc.rnp.br
remep.pop-sc.rnp.br
CHAMADOS:

+55(48)3721-3000
INOC: 11242*100





Archive powered by MHonArc 2.6.16.

Top of Page