perfsonar-dev - Re: travel to SFO
Subject: perfsonar development work
List archive
- From: Verena Venus <>
- To: Nicolas Simar <>
- Cc: Loukik Kudarimoti <>, Roland Karch <>, Szymon Trocha <>, "" <>
- Subject: Re: travel to SFO
- Date: Mon, 27 Aug 2007 15:42:43 +0200
Hi Nicolas,
Am Monday 27 August 2007 14:47 schrieb Nicolas Simar:
> Hi Verena,
>
> thanks a lot for this list of points. Could you please identify who in
> your opinion should take part to those discussions and give an time
> estimate for them (e.g. for topic one : 2 hours, for topic two : 2 slot
> of 1 hours, etc).
>
For points 1 and 2 I would need at least Jeff and probably Martin and/or Jason
For point 3 I need probably Martin, Jason, Jeff, someone from perfSONAR UI,
and everyone who is interested in the issue :)
I'm not sure about the time slots, maybe 1 hour for each, but maybe someone
of
the others taking part in these points can say something in addition.
Kind regards,
Verena
> > What I have on my personal agenda for the meeting (I need some time slots
> > for them also) are the following points:
> >
> > 1. Schema discussion for owping/hades/ippm (to be discussed with Jeff for
> > compatibility between Hades and AMI), maybe enhanced by schemas for
> > delay/packet loss/reordering in a more specific way. This may take some
> > time, as there are some more or less difficult details.
> >
> > 2. Same goes for bwctl/iperf schema.
> >
> > 3. Store trigger schema in on-demand measurement requests (must-have to
> > store BWCTL on-demand tests from MP to MA). This is somewhat problematic
> > for several reasons:
> > - It's not defined in a schema anywhere so far and there are more than
> > one (reasonable) ways to do it
> > - We really need AA there, as this functionality enables everyone who
> > triggers a BWCTL test to write data on the hard disks of the Hades
> > server.
> > - This functionality must be supported by perfSONAR UI, especially the
> > AA part.
> >
> > It's important to have all these things ready as soon as possible,
> > otherwise it stops my perfSONAR service development for the LHC project.
> > So, I hope we have this complete at the end of the meeting week.
> >
> > Kind regards,
> > Verena
--
Verena Venus Tel: +49 9131 852-8705
DFN Labor
Regionales Rechenzentrum Erlangen
Martensstrasse 1
91058 Erlangen
- Re: travel to SFO, Nicolas Simar, 08/27/2007
- Re: travel to SFO, Verena Venus, 08/27/2007
Archive powered by MHonArc 2.6.16.