Skip to Content.
Sympa Menu

grouper-users - [grouper-users] Running daily Grouper Loader jobs with a command?

Subject: Grouper Users - Open Discussion List

List archive

[grouper-users] Running daily Grouper Loader jobs with a command?


Chronological Thread 
  • From: Peter DiCamillo <>
  • To: "" <>
  • Subject: [grouper-users] Running daily Grouper Loader jobs with a command?
  • Date: Tue, 02 Aug 2011 23:27:29 -0400

I'm working on implementing the Grouper Loader at Brown, and fitting it into our daily provisioning. We need the Loader mainly for the change log, and do Grouper provisioning using local code. We provision Grouper and other systems using programs that run overnight. The starting time for overnight provisioning is fixed (1:30 am). However, after that the times are variable: each step runs when previous steps it depends on have completed. The starting and ending times of the steps can vary considerably during the year. For instance, course group updating can take much longer than usual during a registration period.

I see that the Grouper Loader schedules jobs which run continuously, such as for the change log, and jobs which would normally be run daily, and run at a scheduled time. Instead of running the daily jobs at a fixed time, I'd like to be able to run them as a step in overnight provisioning, after Grouper updating has completed. Is there a way to run those daily jobs using a gsh command or some other command, rather than having them scheduled with Quartz?

Peter





Archive powered by MHonArc 2.6.16.

Top of Page