Skip to Content.
Sympa Menu

perfsonar-user - [perfsonar-user] PSCHEDULER BUG: Pscheduler maximum limit amount of time to schedule a task

Subject: perfSONAR User Q&A and Other Discussion

List archive

[perfsonar-user] PSCHEDULER BUG: Pscheduler maximum limit amount of time to schedule a task


Chronological Thread 
  • From: Murilo Vetter <>
  • To: perfsonar-user <>, monipe-des <>
  • Subject: [perfsonar-user] PSCHEDULER BUG: Pscheduler maximum limit amount of time to schedule a task
  • Date: Thu, 21 Nov 2019 08:31:37 -0300 (BRT)

Hi list,

I would like to notify this bug:

When trying to schedule a long period test (like 1 day = 86400 sec), it is failing to schedule.
The maximum amount of time that it passes is 86090 seconds, missing 310 seconds.
Is there some reason to occur this?

IT IS WORKING:
pscheduler task throughput -s 10.39.2.2 -d 10.39.2.6 -u -t 86090 -b 100m -l 1472
Submitting task...
Task URL:
https://10.39.2.2/pscheduler/tasks/325f5e22-a2bd-48f7-bbe9-9c8edb6f1282
Running with tool 'iperf3'
Fetching first run...

Next scheduled run:
https://10.39.2.2/pscheduler/tasks/325f5e22-a2bd-48f7-bbe9-9c8edb6f1282/runs/c319beb5-34f7-49d8-b54b-92dc90028fe6
Starts 2019-11-21T07:13:46-05 (~7 seconds)
Ends   2019-11-22T07:08:45-05 (~86098 seconds)

IT IS NOT WORKING:
pscheduler task throughput -s 10.39.2.2 -d 10.39.2.6 -u -t 86091 -b 100m -l 1472
Submitting task...
Task URL:
https://10.39.2.2/pscheduler/tasks/0c360306-1266-4849-b66e-d3266cb1bcf9
Running with tool 'iperf3'
Fetching first run...
No runs scheduled for this task.

Regards,
--
Murilo Vetter
Analista de Tecnologia da Informação
REMEP-FLN - Rede Metropolitana Comunitária de Educação e Pesquisa da Região de Florianópolis
PoP-SC - Ponto de Presença da RNP em Santa Catarina
RNP - Rede Nacional de Ensino e Pesquisa
+55 (48) 3721-3000
www.pop-sc.rnp.br | www.rnp.br



Archive powered by MHonArc 2.6.19.

Top of Page