Skip to Content.
Sympa Menu

ntacpeering - Peering and Routing WG Meeting Notes (2016/10/25)

Subject: NTAC Peering Working Group

List archive

Peering and Routing WG Meeting Notes (2016/10/25)


Chronological Thread 
  • From: "José A. Domínguez" <>
  • To: <>
  • Subject: Peering and Routing WG Meeting Notes (2016/10/25)
  • Date: Mon, 31 Oct 2016 16:48:14 -0700
  • Ironport-phdr: 9a23:6SThqRa/N4KjPvPa4nogbcL/LSx+4OfEezUN459isYplN5qZpci4bnLW6fgltlLVR4KTs6sC0LuM9fC4EjRRqb+681k6OKRWUBEEjchE1ycBO+WiTXPBEfjxciYhF95DXlI2t1uyMExSBdqsLwaK+i760zceF13FOBZvIaytQ8iJ3p7xh7j5o8ybSj4LrQL1Wal1IhSyoFeZnegtqqwmFJwMzADUqGBDYeVcyDAgD1uSmxHh+pX4p8Y7oGwD884moppGTazxZ6k1V71eAxwnNXw4/svmqUOFQAeSsCgySGITx1BqBBNE2zi8abv2t678ufdwymPSac//QZgpXi6v4KBtDhLklXFUZHYC7GjLh5ko3+pgqxW7qkknzg==

2016/10/25 Peering & Routing WG


1.  Agenda bash

2.  Update on peering and TR-CPS - I2
  • Jeff spent some time at NANOG. Lots of good content is on YouTube (https://www.youtube.com/results?search_query=nanog+68).
  • Facebook presentation on their network edge was a good one.
  • Opportunity to get capacity upgrades moving.
  • Google (160G moving 250G over the next month),
  • Apple (similar scale capacity upgrades as Google).
  • Planning for next month to complete some of the other capacity upgrades
  • DE-CIX connecting with  2x10G (traffic to move from Equinix Public to DE-CIX)
  • Peering utilization data is accessible via SNAPP graphs. Some more stats on the NOC page.

3.   Network Weather update.
  • Alerts about known upcoming events.
  • Apple to do software updates over the next week or so. Possible bump on Apple traffic.
  • First pilots to move connectors off the Chicago area. Additionally some additional capacity has been added to locations (e.g. Atlanta). Started with Indiana.

4. RPKI update
  • Next project from the Security group. At this point is about getting the word out. Is there a website with details? Andrew Gallo has been working on a Google share.
  • Is there a baseline to use for comparisons at a later time (after implementation). The Security WG will work on defining a baseline to determine success.

5. Multicast
  • Do we continue to support ASM and full MSDP meshes?
    • Want to schedule a sunset project for ASM in favor of SSM.
    • What are people using ASM for nowadays?
    • How to gather that information? The goal is to try to remove ASM from the design phase for new networks.
    • Next step is to take it to the next NTAC meeting.
    • Should we create a focus group for the migration from ASM to SSM (similar to the openflow to MPLS short-lived working group).


6. AOB

Attachment: signature.asc
Description: OpenPGP digital signature



  • Peering and Routing WG Meeting Notes (2016/10/25), José A. Domínguez, 10/31/2016

Archive powered by MHonArc 2.6.19.

Top of Page