ntacpeering - Re: Peering and Routing WG Meeting 8-20-13 4:00PM EDT
Subject: NTAC Peering Working Group
List archive
- From: Darrell Newcomb <>
- To: " Routing WG" <>
- Subject: Re: Peering and Routing WG Meeting 8-20-13 4:00PM EDT
- Date: Tue, 20 Aug 2013 11:50:43 -0700
On Aug 20, 2013, at 10:07 AM, Dale Finkelson wrote:
> The NTAC Peering and Routing Working Group call is scheduled for Tuesday
> Aug 20th, at 4:00 EDT. Here are the call details:
>
> 734- 615- 7474 or 866- 411- 0013
> access code 0133542#
>
> NTAC Peering and Routing Working group
> 8/20/13, 4:00 EDT
>
> 1. Agenda bash
> 2. Update from Internet2 on peering and TR-CPS
> 3. Continued discussion of Connector <-> TR-CPS paths.
> 4. Any update on the discussion of metrics or reports on performance and
> measurement..
Regarding item #3:
Attached are some data points to support dialog during meeting. Largely
related to discussion earlier this year about Connector AL2S <> TR-CPS
Exchange point site connections.
Of those slated for activity over the summer two of the 4 link
additions are in-place. Those being in Seattle and Los Angeles with active
demand being mapped onto the links. One in New York has been under
deployment. And the additional link from Dallas toward Houston received
approval a short while ago and is now under active effort to complete.
In addition to those mentioned above; a prudent approach for an additional
20Gbps capacity in the Washington DC area has been identified and is pending
review/approval.
Those are reflected in the attached spreadsheet with usage data for those
cities.
Attachment:
TR-CPS - Internet2 Aggregation interconnectsAug2013.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
- Peering and Routing WG Meeting 8-20-13 4:00PM EDT, Dale Finkelson, 08/20/2013
- Re: Peering and Routing WG Meeting 8-20-13 4:00PM EDT, Darrell Newcomb, 08/20/2013
Archive powered by MHonArc 2.6.16.